Light Cinema

The Light cinema is a busy and bustling entertainment space with premises from Addlestone to Wisbeach. We were employed to upgrade welfare facilities at their Walsall branch ensuring their high standards of customer experience and satisfaction were maintained.

On this project we worked alongside other trades to give the washroom facilities a new lease of life. You can find further details on some of the specifics below, however if there is anything you’d like further information on then please do get in touch with our helpful team.

Strip out/demolition

Of course, much of this part of our service is self-explanatory! However, on this particular job there was an extra requirement to keep many of the existing cubicles to reuse. Therefore, we had to be careful when extracting them from the washroom areas and also ensure that they were well protected throughout the rest of the refurbishment until we were ready to reinstall them, clean them up and have them looking like new again!

Toilet cubicles & IPS Panelling

Having previously installed flush fronted cubicles from TBS Amwell, we were happy to see that the majority of toilet cubicles still looked fantastic. Therefore, the preservation of them once they have been “un-installed” was super important throughout the build. Aside from the clean once they were reinstalled, we had a few small modifications and repairs to make such as fitting some new locks and outward opening door kits to have them looking like new again.
We also installed new IPS panels where necessary, again preserving some products which our client wanted to have reinstalled. For example, disconnecting and removing the hand dryers to relocate them once the building works were complete.

Upgrading flushing mechanisms

As we know, hygiene and infection control in any public space is paramount so one of the requirements was to upgrade the WC flushing mechanisms to sensor flushes. There were 3 in the male and 12 in the female toilets to install, connect, test, commission and certify as part of this refurbishment process.

Services provided

  • Strip out/demolition
  • Decorating
  • Plumbing 1st & 2nd fix
  • Electrical 1st & 2nd fix
  • Mastic services
  • Installation of baby change units
  • Re-installation of existing cubicles and IPS
  • Installation of new cubicles and IPS where necessary
  • Hand dryer wall panel installation
  • Upgrade flushing mechanisms

Project duration: 3 weeks